The salient features of the Mumbai Coastal Road Projects are:
- The project cost of the Coastal Road Project is Rs. 12,721/- Cr. (excluding rehabilitation, acquisition & landscaping)
- Length of Road: 10.58 Km
- Number of Lane: 8(4+4)
- Road on Reclamation: 4.35 KM
- Tunnel: Length of twin tunnel:3.45 Km, 11 Mt. internal diameter(3 lane each)
- Underground Car Parking: 03, Total no. of car: 1856
- Total Reclamation area: 111 Ha
- Area for recreational purpose: 70 Ha
- Interchanges:03, Length of interchanges: 15.66 KM
- Promenade: 8.55 KM
- Dedicated BRTS Lane
- Sea Wall: 7.47 KM
The work of Mumbai Coastal Road Project(South) is divided into three packages and Letter of Acceptances have been issued to the contractors of each packages in October 2018 after approval of the statutory committee of the corporation to appoint the contractors for this work.
The following Contractors and Consultants have been appointed for this project:
| Package | Name of Package | Contractor | General Consultant | Project Management Consultant |
| Package-1 | Priyadarshini Park to Baroda Palace | M/s. L & T. Ltd.(Project Cost Rs. 5290 Cr.) | M/s. AECOM Asia Co. Ltd.(Contract Cost Rs. 34.92 Cr.) | M/s Louis Berger Consulting Pvt. Ltd. (Contract Cost Rs. 50.52 Cr.) |
| Package-2 | Baroda Palace to Worli End of Bandra Worli Sea Link | M/s. HCC-HDC (JV)(Project Cost Rs. 3211 Cr.) | M/s. AECOM Asia Co. Ltd. | M/s. Egis India Consulting Engineers Pvt. Ltd. (JV) (Contract Cost Rs. 57.61 Cr.) |
| Package-3 | Princess Street Flyover to Priyadarshini Park | M/s. L & T. Ltd.(Contract Cost Rs. 4220 Cr.) | M/s. AECOM Asia Co. Ltd. | M/s. Yooshin Engineering Corporation- M/s Tech Cuatro S.A. (JV) (Contract Cost Rs. 85.76 Cr.) |
| | Total Project Cost | Rs. 12721 Cr. | | |